China SHANXI BLACK TOMBSTONE
(1)Stone Brazilian use thickest foam to avoid cracks.
(2)dilivery time: within one week for one container,if you need urgent,we can do for you faster.
(3)0 terms: TT prepay 30% or LC at sight.
(4)mainly 15:Europe Portugal Stone Asia 15
This entry was posted on 2009-06-22 03:24:10 at 2009-06-22 03:24:10:2009-06-22 03:24:10 2009-06-22 03:24:10 and is filed under Stone Material. You can follow any responses to this entry through the RSS 2.0 feed.You can leave a response.
Leave a Reply